Services We Provide
Setting your home....
Rough estimates can be requested for your information only.
We prefer to do actual quotes with your elevation prints and
send them to you after your home is on our schedule. Thank
you for your cooperation.
 | | Consulting
|
 | | Analysis
|
 | | Advice
|
 | | See page about us |
| | |
Services
Townhouses
Finished Product
Greiner Industries
Airport Terminals
Cecil County Airport Terminal
Cecil County Airport Terminal
Runway view
Cecil County Airport Terminal
Cecil County Airport Terminal
Standard procedure on the jobsite.
1. Check foundation for size and then mark it for the units.
2. Adjust and/or cut lolly columns to proper height.
3. Strip boxes – place garbage in dumpster and/or one pile.
4. Fasten first to second floors around perimeter.
5. On two-story house, identify and drop through electrical connections.
6. Align modules to meet evenly at floor, ceiling, doorways and stairwells.
7. Raise roofs, install knee walls, set top flips & or roof panels, lower overhangs, and install collar tie.
8. Install Simpson Fasteners where required.
9. Tyvek & install gable end panels, reverse gables, dormers, and/or crickets.
10.Fasten first floor boxes to sill plate.
11.Temporarily fasten lolly columns.
12.Install felt paper, ice & water shield, shingles, roof caps.
13.Bolt basement marriage wall beams where required by manufacturer.
14.Temporarily weather-in house by covering openings with felt, plastic, or builder provided tarps.
15.Stack carriers.
Note: All of this is done per manufacturer prints specific for each home.